Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2009-04-25 09:22:42
Size: 649
Editor: AndreDeHon
Comment:
Revision 4 as of 2009-07-29 00:02:44
Size: 926
Editor: AndreDeHon
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
    * Lead by: [[http://www.eecs.umich.edu/~taustin/|Todd Austin]]
Line 10: Line 11:
    * Lead by: [[http://users.crhc.illinois.edu/kalbar/|Zbigniew Kalbarczyk]]
Line 11: Line 13:
    * ''likely defer to October meeting''
Line 12: Line 15:
    * Contact: Heather Quinn
Line 13: Line 17:
    * Lead by: Sarah Michalak (LANL), Armando Fox (UCB)

Challenges

See the draft charge template for the challenge groups.

Constituency Groups

We are dividing up and defining the challenge by major constituency groups that may have widely different needs. As the groups refine their challenge articulation, we can identify commonality.

  • Commercial and Consumer Electronics (e.g. laptops, cell phones, gaming, mp3, DVR)
  • Infrastructure (e.g. Networking, telephony, building control, Smart Grid)
  • Life Critical (e.g. Automotive, Medical)
    • likely defer to October meeting

  • Space/Avionics (e.g. Airplanes, Satellites)
    • Contact: Heather Quinn
  • Large-Scale Systems (e.g. Supercomputers, Data Centers)
    • Lead by: Sarah Michalak (LANL), Armando Fox (UCB)

Challenges (last edited 2010-03-02 23:14:34 by AndreDeHon)